Buy an under-construction home in Malaysia with a loan, and your first monthly instalment can look tiny, then creep up every few months. That creeping bill has a name. It's progressive interest, and once you see how it works, it stops being a surprise.

What is progressive interest? The short answer

When you buy an under-construction home with a loan, the bank doesn't hand the developer the whole loan on day one. It releases the money in stages as the developer hits certified construction milestones, and you pay interest only on what has been released so far (NextSix; EdgeProp). Full instalments, principal plus interest, usually start after vacant possession, once the loan is fully released (NextSix). So your monthly bill rises as the building goes up.

The brochure shows the show unit. The loan offer shows the stages. Read the second one.

Where the stages come from: Schedule G and Schedule H

Schedule G and Schedule H: which one is yours

For housing projects licensed under the Housing Development (Control and Licensing) Act 1966, the payment stages and their percentages are fixed by the standard sale and purchase agreement: Schedule G for landed homes and Schedule H for apartments and condominiums (EdgeProp). These schedules sit under the Housing Development (Control and Licensing) Regulations 1989, last rewritten for new developer licences from 1 July 2015 (Federal Government Gazette, P.U. (A) 106/2015). If your developer is licensed, you shouldn't be negotiating a home-made payment plan; you should be reading the statutory one.

Who certifies a stage, and why it matters

A developer can't simply decide a stage is done. Under both Schedule G and Schedule H, every payment notice has to be backed by a certificate signed by the developer's architect or engineer in charge of the project (P.U. (A) 106/2015), and your bank releases funds against those certified claims (NextSix). That certificate is what moves your interest bill. No certificate, no release, no extra interest.

What the stages look like

Typically the money follows the visible work: signing the SPA, then foundations, the structural frame, walls, roofing, doors and windows, internal plastering, electrical and plumbing work, and finally vacant possession (EdgeProp). The percentages themselves are set in the regulations. For projects under developer licences issued from 1 July 2015, the third schedule of both Schedule G and Schedule H sets them out like this (P.U. (A) 106/2015):

StageSchedule G (landed)Schedule H (strata)
1. On signing the SPA10%10%
2(a) Foundation (H: work below ground level, including foundation)10%10%
2(b) Structural framework15%15%
2(c) Walls with door and window frames10%10%
2(d) Roofing (H: roofing/ceiling), wiring, plumbing, gas piping, telecoms trunking10%10%
2(e) Internal and external finishes, including wall finishes10%10%
2(f) Sewerage works5%5%
2(g) Drains2.5%2.5%
2(h) Roads2.5%2.5%
3. Vacant possession, with water and electricity ready17.5%17.5%
4. On vacant possession with title delivered (G: title registered to the buyer; H: transfer instrument and strata title)2.5%2.5%
5. Retention held back on vacant possession: 2.5% released at 8 months and 2.5% at 24 months after vacant possession5%5%
Total100%100%

Projects under older licences follow the earlier schedule, which splits a few stages differently. Either way, the figures that bind you are the ones printed in your own SPA, so check them there.

How to calculate progressive interest: a worked example

You don't need a rate to understand the mechanics. You need two numbers from your own bank's loan offer, and the Schedule stages above.

  • Number A: the monthly interest you'd pay once the whole loan has been released.
  • Number B: your full monthly instalment (principal plus interest) after vacant possession.

While the house is being built, you pay interest only on what the bank has released so far, so your progressive interest is roughly Number A × the share of the loan released. The bank releases money against the developer's certified stage bills, so the Schedule shares tell you how fast that share grows.

Here's an illustration. The MYR figures are invented round numbers, not a quote from any bank: say Number A is MYR1,300 a month and Number B is MYR1,900 a month. Replace both with your own bank's figures.

Stage reached (Schedule G/H)Share of the price billed so farRough monthly progressive interest (illustration)
2(a) Foundation20%about MYR260
2(b) Structural framework35%about MYR460
2(c) Walls with door and window frames45%about MYR590
2(d) Roofing, wiring, plumbing and services55%about MYR720
2(e) Internal and external finishes65%about MYR850
2(f) to 2(h) Sewerage, drains and roads75%about MYR980
3. Vacant possession92.5%about MYR1,200
After vacant possessionFull instalments startabout MYR1,900 (Number B)

The shares are the cumulative Schedule G/H stage payments from the table above, which are legal shares of the purchase price, not finance figures. Treat the interest column as a rough guide only: the part of the price you pay from your own pocket isn't borrowed, so the bank's releases won't match the billed share exactly. Your loan statement is the figure that counts.

Then comes the jump. Once the loan converts to full instalments, you start repaying principal as well as interest. On this illustration, the buyer who budgeted for about MYR260 at the foundation stage is looking at about MYR1,900 a month after vacant possession, roughly seven times more. Nothing went wrong. That's just how the structure works.

Can a young couple afford an undercon house? A budget check

Buying an under construction house is often a young couple's first big decision together, so here's a simple monthly budget check. Every number below is invented and rounded, for illustration only, and it uses the same Number A and Number B as the worked example above. Swap in your own bank's quote.

Say the couple bring home MYR9,000 a month between them, pay MYR1,800 in rent while they wait, and already have a car loan of MYR800 a month.

StageRentProgressive interest (illustration)Car loanMonthly total
Early: foundation stageMYR1,800about MYR260MYR800about MYR2,860
Middle: finishes stageMYR1,800about MYR850MYR800about MYR3,450
Near the end: vacant possession, before full instalments startMYR1,800about MYR1,200MYR800about MYR3,800
After vacant possession, moved in, rent stopsnonefull instalment about MYR1,900MYR800about MYR2,700, plus maintenance and bills

Three things to take from it:

  1. The hardest months are just before you get the keys. Rent and interest peak together, after the brochure excitement has worn off.
  2. Budget for the full instalment from day one. If the couple can't comfortably afford their own Number B, the cheap early months only delay the problem.
  3. Delays stretch the expensive middle. A late project means more months of rent on top of rising interest.

Run the same table with your own income, rent, loans and your bank's real figures before you book.

The squeeze nobody budgets for

The real pain isn't the interest on its own. It's the interest on top of everything else.

  • Rent and interest at the same time. Most first-time buyers are still renting while the home is built. Rent stays flat while progressive interest climbs. That double payment is the squeeze.
  • Delays move the finish line. Releases follow certified progress, not brochure targets (NextSix). A slow project can keep your interest lower for longer, but it also pushes vacant possession back, which can mean more months of rent.
  • Floating rates move. New retail floating-rate housing loans in Malaysia are priced off the Standardised Base Rate (SBR) plus the bank's spread. The SBR is linked solely to Bank Negara Malaysia's Overnight Policy Rate (OPR), so when the OPR changes, the SBR moves by the same amount, and banks generally can't raise your spread during the loan unless your credit risk profile changes (Bank Negara Malaysia, Standardised Base Rate consumer guide). Check the current OPR on BNM's site on the day you're deciding; I'm not quoting one here.

Keep a cash buffer, and map the stages into your calendar before the first claim lands.

What progressive interest does to your DSR and future borrowing

Your debt service ratio (DSR) is how banks judge whether you can take on more borrowing.

Your DSR is your total monthly loan repayments divided by your net monthly income. Each bank sets its own limit and its own way of counting, so ask yours before you sign.

How a partly drawn progressive facility is counted, whether by the amount drawn or the full facility, is a question to put to your own bank before you sign, because it can affect your next purchase. Ask your bank how it counts the undrawn facility. If you're planning to buy overseas as well, read how CCRIS and CTOS affect buying UK property.

How buying into a UK housing development is paid for

The UK works differently, and it's worth seeing the contrast clearly.

In our UK housing development, you put down a house deposit rather than drawing a Malaysian loan in stages. Payments, deposit included, go directly to the developer. It isn't a licensed Malaysian housing project, so the Schedule G and H stages above don't apply to it. If you want to know what you'd need to get started, see how much money you need to start investing in overseas property and our guide to UK mortgage options for Malaysians. UK purchase taxes are a separate cost; our UK stamp duty guide for Malaysian buyers covers them.

How the build can be financed is one of the things we go through at the seminar.

Questions to ask before you sign an undercon SPA

  • What is the stage timeline, and when does the developer expect each certificate?
  • What compensation does the SPA give me for late delivery?
  • If the project slows, what happens to my interest and to my rent plans?
  • If the developer offers to bear interest before vacant possession, exactly who pays, until when, and is it in writing?
  • Is my loan fixed or floating, and how does the rate change if the OPR moves?
  • How does my bank count this facility when I apply for my next loan?

FAQ

What is progressive interest?

Interest you pay on the part of your housing loan the bank has released so far, while an under-construction property is being built. It rises as more of the loan is released at each stage.

When do full instalments start?

Usually after vacant possession, when the loan is fully released and you begin repaying principal as well as interest. Check your own loan offer.

What are Schedule G and Schedule H?

The standard sale and purchase agreements for licensed housing developments in Malaysia: Schedule G for landed homes, Schedule H for strata or high-rise. They set the payment stages.

What percentage is paid at each stage?

For projects under developer licences issued from 1 July 2015, Schedule G and Schedule H both set 10% on signing the SPA, 65% across the construction stages, 17.5% at vacant possession, 2.5% when title is delivered and a 5% retention released after vacant possession (P.U. (A) 106/2015). Older projects follow an earlier schedule; your own SPA is the figure that counts.

How do I calculate progressive interest?

Ask your bank what your monthly interest would be once the whole loan is released, then multiply it by the share of the loan released so far. Your bank's statement is the figure that counts.

Does a construction delay change my progressive interest?

It changes the timing. Releases follow certified progress, so a delay can keep you on part-interest longer and push back vacant possession; it may also leave you paying rent for longer.

Is buying UK property paid for the same way?

No. In our UK housing development you put down a house deposit, paid directly to the developer, rather than drawing down a Malaysian loan in stages. We explain the full payment and finance picture at the seminar.

How do I calculate my DSR?

Add up all your monthly loan repayments and divide the total by your net monthly income. Each bank sets its own limit and its own way of counting, so ask yours before you sign.

Is it better to buy undercon or subsale?

Neither is better for everyone. An undercon house is paid for in stages under Schedule G or Schedule H, usually with progressive interest while you wait, but you can't see the finished home and delays are possible. A subsale home can be inspected and lived in sooner, but full instalments usually start straight away. See where the stages come from.

Educational only, not legal, financial or tax advice. Property values can go down as well as up, and interest rates can rise. Loan terms differ by bank and change; check your own loan offer and SPA, and speak to an independent adviser. Related: UK property and the Resources Hub.